DIA Business Announcement — Business Opportunities
Get Project Document

CITY AND COUNTY OF DENVER

DEPARTMENT OF AVIATION

NOTICE OF INVITATION FOR BIDS

CONTRACT NO. 201522219

High Line Canal Phase 2 Asbestos Remediation Project

The Department of Aviation, City and County of Denver, has issued an Invitation for Bids for the construction project named above. Complete contract documents, including specifications, are available on the DIA Contract Procurement website at http://business.flydenver.com/bizops/bids.asp beginning June 22, 2015.

SEALED BIDS will be due no later than 2:00 PM, Tuesday, July 14, 2015 Local Time, delivered in the triple wide trailer, located within the DIA South Campus at 7128 North Trussville Street, Unit A, Denver, CO 80249 (F.K.A. 27301 E. 71st Ave, Unit #2). Bids must be time stamped no later than 2:00 PM, Tuesday, July 14, 2015, immediately after which a public bid opening will commence. Any bids to be submitted more than one hour prior to Bid Opening must be submitted at the office of Business Management Services, attention Letitia Harper, Room 8810, Airport Office Building (AOB), Denver International Airport, 8500 Peņa Blvd., Denver, CO 80249-6340.

A MANDATORY PRE-BID CONFERENCE will be held at 9:00 AM, Monday, June 29, 2015, at the Stapleton Redevelopment Office, 6753 E. 47th Drive, Unit D, Denver CO 80216.

GENERAL STATEMENT OF WORK AND COST ESTIMATE:

The project consists of the environmental remediation of Asbestos and non-hazardous waste under the approved Voluntary Clean Up Plan (VCUP) from the Colorado Department of Public Health and Environment (CDPHE) within a Lateral of the High Line Canal located at the former Stapleton Airport between Moline and Peoria Streets and 25th and 26th Avenues. The project consists of the excavation, removal and soil clearance of non-hazardous landfill material, and Non Friable Asbestos Containing Materials Debris in soil from the areas identified in these plans and specifications. The project consists of loading, hauling, backfilling, and compaction of all excavations to a minimum of 95-percent standard proctor maximum density. The projects consist of loading and hauling Non Friable Asbestos Containing Materials Debris in soil or construction debris to DADS. The project also includes the completion and submittal of a Closure report for the site work and receipt of a No Action Determination (NAD) letter from the State of Colorado for High Line Canal Phase 2 Project. Contract term is one (1) year.

PREQUALIFICATION: Each bidder must be pre-qualified in the category of 3(a) Environmental Remediation: Asbestos, at the $6,000,000.00 level. Prequalification applications are due at least ten (10) calendar days prior to the bid opening date. Prequalification applications must be submitted to the Department of Public Works, Prequalification Section, 201 West Colfax Avenue, Department 506, Denver, Colorado 80202. To view the Rules and Regulations and to obtain a prequalification application, please visit our website at www.denvergov.org/prequalification or call 720-865-2539 for prequalification information ONLY.

MINORITY/WOMEN BUSINESS ENTERPRISE GOAL: Pursuant to Article III, Division 1 of Chapter 28 of the Denver Revised Municipal Code, the Project goal of 16% must be met with certified participants, or through the demonstration of a sufficient good faith effort. For compliance with good faith requirements, the M/WBE percentage solicitation level required for this project is 100%.

As its best interests may appear, the CEO reserves the right to reject any or all bids and to waive informalities in bids.

Publication Dates: June 22, 2015, June 23, 2015, June 24, 2015

Published in The Daily Journa