Great Hall Contracting
Click here to see the Great Hall concession RFPs that are now available!

The Great Hall Project is a truly transformational project that will deliver substantial improvements across a wide range of areas of Denver International Airportís Jeppesen Terminalís Great Hall. The project will:

  • Improve airport safety and security
  • Rebalance processing facilities to optimize the terminal for the future
  • Transform the passenger experience
  • Enhance operational efficiency
  • Optimize space to increase revenues
  • Upgrading aging systems, facilities and conveyances

This exciting Public Private Partnership (P3) project has a carefully phased four-year construction program led by Great Hall Builders, which will include upgrades for the entire Jeppesen Terminal, including escalators and elevators, restrooms and other infrastructure that is now more than 22-years old. This will be followed by a 30-year operational period during which Great Hall Partners will be managing the concession operations on levels 5 and 6 of the terminal within this new world-class environment.

As part of the vision for the Great Hall Project, the Great Hall Partners and Great Hall Builders are committed to utilizing local subcontractors, suppliers and concession vendors including Airport Concession Disadvantaged Business Enterprises (ACDBEs) and Minority/Women-Owned Business Enterprises (M/WBE).

The team looks forward to working with local firms, especially certified firms, as part of our commitment to the development and utilization of small businesses in the regional area.

The City and County of Denver's Division of Small Business Opportunity has established the following MWBE participation goals on this project:

  • 33% of the Design/Professional Services costs
  • 18% of the Construction costs

Visit the DEN Commerce Hub to learn how to initiate a partnership with DEN and the City & County of Denver on future projects. This information will be updated regularly.

DEN reserves the right to cancel or alter project information at any time.

For more information about the Great Hall Project and the opportunities listed below, please email: info@greathallbuilders.com.

 Current  Future  
PROJECT DESCRIPTION EST. PROJ.
VALUE
DATE POSTED
CAD Tech/Revit Drafting Perform advanced and specialized drafting (2D and 3D) to support design activities. Develop graphic presentations that include design features. Prepare layouts, drawings and designs, from detailed sketches and/or drawings made by technicians, designers or technical professional, converting paper documents into computerized files. Calculate quantities. Additional information: CAD Tech/Revit Drafting. TBD 3/21/2018
Electrical Quality Control Inspection Supervision of project documents as material submittals, shop drawings, methods of installation, site delivery inspections for low voltage, lighting control, BMS, communications, CCTV and fire alarm. Additional information: Electrical Quality Inspection. TBD 3/21/2018
Mechanical Quality Control Inspection Supervision of project documents as material submittals, shop drawings, methods of installation, site delivery inspections for drainage, water supply, HVAC, gas and fire suppression. Additional information: Mechanical Quality Control Inspection. TBD 3/21/2018
Curtain Wall Preparation for the selective demolition of existing Jeppesen Terminal curtain wall, automatic entrances and entry vestibules. Furnishing and installing new curtain wall assemblies at the office expansion along the AOB corridor. Furnishing and installing new entry vestibules at the Jeppesen Terminal Level 6 passenger drop-off including curtain wall, storefront and automatic entry door assemblies. TBD 3/27/2018